Skip to content
건강 앤 골프 · Tools
KO EN

Roof Pitch Calculator — Rise Over Run | How to use and interpret results

Calculate slope, angle and a sloping-length multiplier from rise and horizontal run. This is geometry rather than a roofing materials or structural-design system.

Numbers stay on your device. Nothing is sent to a server.

How to use this tool

Enter vertical rise and horizontal run in the same unit. Rise may be zero; run must be at least 0.01.

Results and examples

A rise of 6 and a run of 12 give 6/12 pitch, about 26.57 degrees and a multiplier of about 1.1180. That multiplier is the hypotenuse divided by horizontal run, expressing a length relationship rather than a material order.

Worked example

A rise of 6 and a run of 12 give 6/12 pitch, about 26.57 degrees and a multiplier of about 1.1180. That multiplier is the hypotenuse divided by horizontal run, expressing a length relationship rather than a material order.

Limitations

  • Hips, valleys, overhangs, openings and waste are not calculated separately.
  • Building requirements and load conditions are not checked.

Fields

FieldGuidance and constraints
RiseAccepted range: 0–100000 · Input step: 0.01
Horizontal runAccepted range: 0.01–100000 · Input step: 0.01

Data handling

Processing stays in the current browser tab; the site does not upload tool input for the calculation itself.

Sources

Frequently asked questions

Can I use millimetres?

Yes. Use the same unit for both dimensions.

Does 1.118 mean buying 11.8 percent more material?

Not by itself. Roof layout and waste factors are absent from this geometry calculation.

Related tools

You do not need to start over. Continue with the tool that fits your next step.

error: 우클릭 할 수 없습니다.